Pre-Installation All materials and documentation relevant to this particular section of work shall be checked before installation and all the installation shall be as per approved drawings. Before any permanent work will be started, an inspection of all materials, tools and accessories shall be carried out. Cables shall be checked for continuity and insulation resistance and records shall be kept…
Activity Working at height Lifting Material Storage Power Tools Hazardous Situation Physical and Health Injury Fall, stuck by, hit by materials, back injury Tripping Strike by-Bursting of Disc