Method Statement For installations and testing of 11KV cables
Original price was: $7.$5Current price is: $5.
Pre-Installation
All materials and documentation relevant to this particular section of work shall be checked before
installation and all the installation shall be as per approved drawings.
Before any permanent work will be started, an inspection of all materials, tools and accessories shall be carried out.
Cables shall be checked for continuity and insulation resistance and records shall be kept for future reference.
Ensure that proper access to execute the works is in a suitable condition and free from obstruction.
Description
This Safe Work Method of Statement (SWM) describes the installation of 11 kV cables and all relavent works to make the system function corretly and properly in compliance with [Company/State’s] standards.