Method Statement for Firefighting pipes installation Civil Work
Original price was: $5.$3Current price is: $3.
Scope of Work Method Statement for Firefighting pipes installation Civil Work
Description
Civil Work:
Detailed supply and install precast concrete pipe support pedestals:
Prior Activities:
Pre – Construction Survey: The Pre-Construction survey will be carried out in the work area as deemed necessary for the work.
Supply of pedestals: Define and identify the separate area for loading and unloading material from the trailer. The precast concrete pipe support pedestals will supply to the site loaded on a 50-60-ton trailer or smaller as per site requirement and will be offloaded by using a Hiab crane in a dedicated storage area on the site.