SCOPE OF WORK This procedure defines the method to be used to ensure that building wires installations are correct and acceptable and shall conform to the specifications.
Pre-Installation All materials and documentation relevant to this particular section of work shall be checked before installation and all the installation shall be as per approved drawings. Before any permanent work will be started, an inspection of all materials, tools and accessories shall be carried out. Cables shall be checked for continuity and insulation resistance and records shall be kept…