Sale!
SWMS-Inspections Assessments and Audits
Original price was: $7.$5Current price is: $5.
GENERAL REQUIREMENTS
To operate/drive motorized heavy equipment or a light vehicle (hereafter referred to as equipment/vehicle), employees must, at a minimum:
A. Have a valid state/country driver’s license.
B. Be designated by the Project Manager or his designee to drive
C. Application for Designated Driver).
D. Be mentally alert and possess the physical ability to drive a motor vehicle safely.
E. Display a responsible attitude.
F. All restrictions of the employee’s state/country driver’s license are automatically applicable to operating equipment/vehicles.
Description
Work Method Statement Key Highlights
This practice explains and describes the requirements for the safe operation of motorized heavy equipment and light vehicles at the worksite.
- General Requirements
- Inspections
- Heavy Equipment Operators
- Signal Persons
- Road Rules
- Standard Equipment
- Maintenance
- Training and Licensing
Reviews
There are no reviews yet.