Sale!

Site Installation Demolition Risk Assessment

Original price was: $7.Current price is: $5.

This document is generated for the site installation works including demolition related to the construction industry and civil area. The file is in Microsoft Word format and you can print it simply on A3 paper very easily. The demolition installation works risk assessment file is free from spelling and grammar errors and no need to check for that. Some highlights of the demolition installation risk assessment that will enable you to know the purpose, scope and format of the document.

SKU: site-installation-demolition-risk-assessment-qhsedocs-hse Category: Tags: , , , , , ,

Description

Some Highlights from the Document

  1. All staff to undergo project safety induction to get project information, requirements and awareness on the risks involved in the activities.
  2. Ensure that the workplace access & egress points are clear of obstruction at all times.
  3. Provide a suitable work platform and approach to operational areas.
  4. Provide adequate illumination for clear access & egress.
  5. Tool Box talk training
  6. All employees to wear appropriate PPE safety shoes, hard hats and high visibility vests at all times during works.
  7. All equipment must be certified/licensed and fitted with a horn, reverse alarms and rotating beacon lights.
  8. All machines are to be operated by qualified and certified operators only.
  9. Banks man/flagman to be deployed for all loading and offloading
  10. Walkways for workers to be marked/separated from traffic route
  11. Sufficient and suitable lights to be arranged along with walkways for night work
  12. Suitable signage in walkways/road/access area
  13. Toolbox talks for the task to be given to the team involved.
  14. Drip trays will be used to contain any accidental spill or leaks of oils.
  15. Any spills of oil will be collected from the soil and will be disposed of as hazardous waste.
  16. Sufficient cool drinking water to be available on site
  17. Shaded areas to be provided
  18. No work during summer restricted times
  19. Ergonomic awareness training should be conducted to all employees making them aware of the risk of back injuries etc.
  20. First Aider and First Aid Box on site
  21. Follow emergency response plan of the main contractor
  22. Continuous supervision by area supervisor.
  23. Tool Box talk training

Reviews

There are no reviews yet.

Be the first to review “Site Installation Demolition Risk Assessment”

Your email address will not be published. Required fields are marked *