- View cart You cannot add another "Method Statement for Erection of Pipes" to your cart.
Sale!
Method Statement for Earthing and Lightning Protection
Original price was: $7.$5Current price is: $5.
Installation Methodology:
- The Electrical Engineer and Supervisor I Foreman shall have approved drawings and a set of the layout where the proposed earthing routes are based on the pictures.
- All the installation works are to be carried out following the approved shop drawings. Copy of the approved method statement shall be available at the site during the installation works.
- Manufacturer recommendations and manual instructions shall be strictly adhered to at the installation of the system.
- Routing of earthing and lightning protection air terminal conductor bar shall be marked on the roof layout in coordination with HVAC services and lift machine rooms as these services are present on the roof.
Description
The scope of this Method Statement is to detail the method of installation to ensure that Earthing & Lightning Protection is correct, and acceptable and confirm the contract document specification and international standards.
Reviews
There are no reviews yet.