Sale!
METHOD STATEMENTS FOR ASSISTIVE LISTENING SYSTEM INSTALLATION
$9 Original price was: $9.$6Current price is: $6.
Methods of Installation
Stationary FM Transmitter
- Unpack the Product-Remove outer packaging and plastic cover Inspect for physical damage.
- Mount in Rack (if necessary) – If rack mounting the unit, install the optional rack mount kit (LT-326) according to the instructions included with the kit, then install the T-800 in the rack
- Connect Antenna-Connect the antenna according to the installation instructions.
- Only use an antenna supplied by Listen. If you are connecting the antenna directly to the top of the LT-800, you will need to remove the rubber plug on top of the unit. If you are using a remote antenna connected to the rear of the unit, do not connect an antenna to the top connector.
SKU: method-statements-for-assistive-listening-system-installation
Category: METHOD STATEMENTS
Tags: ASSISTIVE, installation, LISTENING, method, STATEMENTS, system
Description
Document Additional Information:
In MS Word A4 paper size
Fully aligned and editable
Free from spelling and grammar errors
Purchase Method:
Digital downloadable product
Available to download as you purchased
Payment Methods:
You can pay by PayPal
Direct bank transfers
Be the first to review “METHOD STATEMENTS FOR ASSISTIVE LISTENING SYSTEM INSTALLATION” Cancel reply
Related products
-
- Sale!
- METHOD STATEMENTS
Method Statement for Erection of Pipes
-
$5Original price was: $5.$3Current price is: $3. - Add to cart
-
- Sale!
- METHOD STATEMENTS
Gypsum board installation to wall method statement
-
$7Original price was: $7.$5Current price is: $5. - Rated 3.50 out of 5
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Incidental Asbestos Handling
-
$7Original price was: $7.$5Current price is: $5. - Add to cart
Reviews
There are no reviews yet.