Scope of Work Method Statement for Erection of Pipes
Description
Erection of Pipes:
- Ensure that all tools needed for Erection are ready.
- Determine the position of the pipe supports as per pedestal location. Pipework shall be installed following the piping general arrangement and their supporting approved shop drawings and specifications.
- Drill holes in the pedestals using a portable electric drilling machine ensuring that the correct drill bit size is used.
- Fix supports in position using anchor bolts and ensure all fixing are tight and secure.
- All pipes shall be inspected before erection to ensure that they are free from loose contamination.
- Place pipes in position if required using lifting hoists/ straps and chain blocks.