Sale!

Project Risk Register

(2 customer reviews)

Original price was: $7.Current price is: $5.

This document Project Risk Register created related to construction, facility management, MEP and civil area. It will save your time for the preparation of the required document because the file is in Microsoft Word format covering all activities and hazards, risks related to each work activity. and you can print it simply on A3 paper very easily. The Risk Register-hazard Identification and Risk Assessment Sheet file is free from spelling and grammar errors and no need to check for that.
The following is some highlights of the Risk Register that will enable you to know the purpose, scope and format of the document.

SKU: project-risk-management-program-risk-register-hazard-identification-and-risk-assessment-sheet-hira Category: Tags: , , , , , , , , , ,

Description

Activity/Process and Hazards

Working in Extreme Weather
country-specific conditions:
Hot climate / high air temperature and humidity,
Holy Month of Ramadan (fasting time)
Multi-national / multi-language workforce Security
Unauthorized access,
Laps of security,
Unavailability of security person at gate,
Unauthorized entrance to the site,
Laps in the inspection of equipment, lone working,
Subcontractors
Hiring and control
Inexperienced contractor,
Improper Subcontractor’s management system,
Subcontractors. workers.
People at Risk
Heat stress,
Heat stress-related illness,
Fatigue,
Language barriers,
National Difference
Cultural differences
Selection of inexperienced personnel
Medically unfit personnel.
Vehicle / equipments
Accident, sabotage, injury, fatality
Lack of coordination and cooperation at site
Dangerous occurrence/incidents
Injury, fatality.

Action to be Taken to Reduce Risk

Company Heat Stress Prevention & Control Program (working timing, cool drinking water, carbo-hydro-electrolyte drinks, shelter, Heat Stress awareness & training, etc.)
Extended break time during the summer period.
Working following the National Regulations.
Reduced working hours as directed by Ministry of Labor Holy Month of Ramadan.
Provision of food and drinks for non-fasting employees during Ramadan.
Competent Supervision to be provided
Selection of personnel based on the project work requirements.
Pre-employment medical screening and surveillance.
Incentive program.
Safety signs, notice boards (to be provided in the language understood by the majority of the workforce
HSE Induction and Training
Safety campaigns
No one will be allowed to enter the site area without
collection of data on the security gate.
A visitor’s induction procedure would always be performed at the security gate.
Induction stickers, visitor’s badges would be provided at the security gate to the visitors.
Unauthorized, forceful entrance will be reported to the management immediately without any delay.
Emergency contact numbers will be posted at the security gate room to contact in case of an emergency.
The site access gate would be controlled by the trained security staff.
Subcontractors to be properly managed as per Company procedure and regulatory requirements.
The documented policies and management system of the Main Contractor to be observed.
An analysis should be carried out to measure that the subcontractor meets the minimum standards of the organization.
Only trained and qualified / authority approved subcontractors should be hired.
Subcontractors with skilled labour should be given preference.
Regular meetings and proper communication with sub contractors.

2 reviews for Project Risk Register

  1. Cazrwww

    Почему работать с нами выгодно

    kyc-diplom.com/pochemu-imenno-my.html

Add a review

Your email address will not be published. Required fields are marked *