-
- Sale!
- METHOD STATEMENTS
Carpet Installation Method Statement
- Original price was: $7.$5Current price is: $5.
- The purpose of this document is to provide sets of an analytical and systematic process for installation of carpet on the [Mention Location/Areas] such as the hallway, lobby and public areas. It will save your time for the preparation of the required method statement document because the file is in Microsoft Word format and you can print it simply on…
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement Cover Installations of PVC Single Core Insulated Wires
- Original price was: $7.$5Current price is: $5.
- SCOPE OF WORK This procedure defines the method to be used to ensure that building wires installations are correct and acceptable and shall conform to the specifications.
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Anchors, Hangers and Supports Installation
- Original price was: $5.$3Current price is: $3.
- Scope of Work method statement for Anchors, Hangers and Supports Installation.
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method statement for concrete repair works
- Original price was: $7.$5Current price is: $5.
- This and hazards such as irritate the eyes, nose, throat, and upper respiratory system, Skin, silica dust, silicosis and/ or lung cancer can be avoided by following health and safety procedures. It will save your time for the preparation of the required document because the file is in Microsoft Word format and you can print it simply on A4 paper…
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Contractor’s Management
- Original price was: $7.$5Current price is: $5.
- This method statement for contractor’s management is written for the facility management & MEP related to high-rise multi-stories buildings, facilities, homes and other residential & commercial areas. Hazards such as manual handling, ergonomic hazards, unsafe use of hand tools, electrocution hazards, contact with rotating parts, poor cable management, chemical hazards (COSHH), virus infection due to waste contamination (Biological waste hazards).…
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Earthing and Lightning Protection
- Original price was: $7.$5Current price is: $5.
- Installation Methodology: The Electrical Engineer and Supervisor I Foreman shall have approved drawings and a set of the layout where the proposed earthing routes are based on the pictures. All the installation works are to be carried out following the approved shop drawings. Copy of the approved method statement shall be available at the site during the installation works. Manufacturer…
- Add to cart
-
- Sale!
- METHOD STATEMENTS
METHOD STATEMENT FOR EARTHWORK, CONCRETE, AND MASONRY CONSTRUCTION
- Original price was: $9.$6Current price is: $6.
- Document Additional Information: In MS Word A4 paper size Fully aligned and editable Free from spelling and grammar errors Purchase Method: Digital downloadable product Available to download as you purchased Payment Methods: You can pay by PayPal Direct bank transfers
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Erection of Pipes
- Original price was: $5.$3Current price is: $3.
- Scope of Work Method Statement for Erection of Pipes
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Excavating Fibrous Materials
- Original price was: $7.$5Current price is: $5.
- This is a technical guideline and methodology for how to handle fibrous material when discovered during the excavating work activity for any installation, demolition, or renovation works.
- Add to cart
-
- Sale!
- METHOD STATEMENTS
METHOD STATEMENT FOR FIRE ALARM SYSTEM
- Original price was: $7.$5Current price is: $5.
- METHOD STATEMENT FOR FIRE ALARM SYSTEM
- Add to cart
-
- Sale!
- METHOD STATEMENTS
Method Statement for Fire Hydrant – Hose & Nozzle Cabinet Assembly Installation
- Original price was: $5.$3Current price is: $3.
- Scope of Work Method Statement for Hose & Nozzle Cabinet Assembly Installation
- Add to cart