Method Statement for Work Walls Plastering Using Dry-Zone Damp-Resistant Plaster
Description
Preparatory Works:
- Arrive on-site, and register attendance with the client/Main-Contractor Attend worksite health and safety induction/training.
- Obtain permits to work (PTW) from the client.
- Wearing hard hats and safety shoes, identify areas where proposed works are scheduled and ensure the plan correctly represents the area of proposed works. Correctly inspect and verify the validity of the surveyor’s Generic risk assessment, and work to this. Make proper confirmation of the suitability of the walls to receive treatment.
- Confined Space entry safe system of work (SSOW), check work conditions in basements, cellars and other voids.