Lifting of Pipes:
- Ensure that all tools needed for Lifting are ready.
- Extreme caution shall be exercised when the pipe is lifted. Be sure there is a clearance between the pipe and any other object to prevent injury.
- When lifting, take a firm grip, secure good footing, place feet a comfortable distance apart, bend knees, keep back straight, and lift with leg muscles.
- Do not twist or rotate the spine to set a load down or pick the load up. If the load is to be carried, keep the spine straight and move the feet. Get help when needed.
- Use gloves or other hand protection as required when handling materials. Don’t carry a load in such a way that it obstructs the vision. Use nylon straps or slings when unloading.